Good day  Mr Krökel ,

 

am  of  the  opinion  that  it  is  important  to  give  you  some  feedback  pertaining  to  the  results  that  we  have  had  so far  from  the  use  of  your  CI Protective  Bags  that  we  have  been  applying  on  our  Export  products  to  our  Plant  in  China.

 

Manufacturing  -  Lead time  as  from  order  to  availability  in  the  US  very  good. 
Supply  to  LMSA  -  Initial  batch  was  late  due  to  misunderstanding  by  Forwarder.
Packaging  of  bags  -  Very  good
Visual  appearance  -  Excellent
User  friendliness  -  Very good
Products  protected  - 

Since  February 2003  completely  built up  Front  and  Rear  Axle

Suspension  sets  were  sent to China  -+12 weeks transit time.

A total of 512  sets  ie :-  1024  bags  used.

Initial trial  of  8  Sets  depicted  slight  rust  -  Investigation  proved that  we  had  made  4 off  holes  in  each  bag  to  secure front assemblies  inside  the  dunnage.  It  allowed  the  free  flow  of  moist  salty  air  through  the  bags  which  in  turn  allowed  some  rust  to  promulgate.

The Rear  Axles  were  not  affected  at  all  as  they  were  not  secured  in  the  manner  as  described  above.

The Series  production  that  followed  showed  no  signs  of  rust  that could  have  been  attributed  to  poor  preservation.  The  handling  of  machined  products  with  bare  hands  was  discontinued  to  prevent  any  potential  acidic  residues  being  left  on  the  assemblies  during  packaging.  -   No  rust  problems  occurred  afterwards.

Subsequent to  the  Complete  Axles ;  Phase 2  was  the  assembly  of  Modules  and  Sub-modules  plus  loose  components  for  use  in  China  by  our  Plant  there  to  complete  Axle  Sets  there  for  BMW.  The  above  will  still  continue  for  some  extended  time.

The initial  batches  of  Modular  Sets  have  been  received  in  China  and  were  inspected  by  LMSA  Process Quality Manager  in  Shengyang  and  found  to  be  totally  rust  free.


I  can  add  that  all  the  components  and  assemblies  are  in  fact  kept  inside  the  bags  by  LAS  for  lengthy  periods  after  Sea freight  due  to  the  fairly  slow  ramp-up  that  is  synonymous  with  a  new  venture.  During  these  longer  than  normal  storage  periods  no  rust  has  been  evident  at  the  time  of  un-boxing  the  parts.I  am  happy  that  we  at  LMSA  were  the  first  Exporter  from  South Africa  and  indeed  in  the  Automotive  Industry  to  have  used  your  product.


It  is  my  hope  that  more  companies  will  make  use  of  your  product.  It  could  in  the  end  not  only  help  reduce  the  costs  but  will  definitely  reduce  in transit  rust  damage  within  the  whole  industry  which  we  have  been  living  with  for  far  too  long.